• Pressurized Buffer Tanks Reduce Water Hammer Damage for Pipe Station
  • Pressurized Buffer Tanks Reduce Water Hammer Damage for Pipe Station
  • Pressurized Buffer Tanks Reduce Water Hammer Damage for Pipe Station
  • Pressurized Buffer Tanks Reduce Water Hammer Damage for Pipe Station
  • Pressurized Buffer Tanks Reduce Water Hammer Damage for Pipe Station
  • Pressurized Buffer Tanks Reduce Water Hammer Damage for Pipe Station

Pressurized Buffer Tanks Reduce Water Hammer Damage for Pipe Station

Certification: ISO9001, CE
Wall Thickness: 8mm
Installation: Sitting Type
Material: Stainless Steel
Type: Stable Pressure
Application: HVAC System/Water Supply System
Customization:
Diamond Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Product Parameters
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
NZG
Warranty
1year
Color
Customized Color
Valve
304 Stainless Steel
Transport Package
Plywood Case Into Container
Specification
Different As Each Model
Trademark
Beite
Origin
Jiangsu China
HS Code
8421219990
Production Capacity
8000pieces/Year

Product Description

Product Description

Our bladder surge tank provides full system protection from both positive and negative pressure surges. The bladder in the tank creates a full separation between the air and the liquid; enabling the tank to operate longer and with no required maintenance.

Verifying optimum operation using the following features:
 Visual Level
 Magnetic Level
 Weight Controller
Free studies of Surge Analysis from the beginning of the project
Advantages of bladder tanks are:
 No contact with water/metal; avoiding eventual corrosion
 Eliminates air compression permanent system

 

Product Parameters

Pressurized Buffer Tanks Reduce Water Hammer Damage for Pipe Station1,Initially, the pre-charge pressure must be adjusted to the value resulting from the hydraulic analysis (pre-charge can be either compressed air or nitrogen). At this stage, the bladder contains no volume at all.
2,When the gate valve is opened, the water will enter the vessel under static conditions and begin to compress the gas (static pressure is always higher than pre-charge pressure).
3,The water entering the vessel will further compress the pre-charged gas until a balance between the liquid and the compressed gas is reached.
4,Immediately after a pump trip, the pressure in the line will start to decrease and the elastic energy in the vessel will cause the discharge of water from the vessel into the line. This prevents dangerously low pressure along the pipe.
5,As the pressure may become very low, the flow will reverse. Water will then enter into the vessel via a reduced diameter (drilled non return valve or bypass) if hydraulically required. Several oscillations may occur before static state is reached.
6,When the pump restarts, the vessel will continue to fill until dynamic steady state is reached and it is then once again prepared for the next pump trip.

Pressurized Buffer Tanks Reduce Water Hammer Damage for Pipe Station

Company Profile

Nanjing Beite Air Conditioning Equipment Co., Ltd. is a high-tech comprehensive enterprise specializing in the research and development, production, sales and after-sales service of HVAC water treatment equipment. Our company has two production plants, four standardized workshops and two office buildings, with a total area of 48,000 square meters. We mainly provide corresponding water treatment equipment for HVAC circulating water system with one-stop supply and service.Pressurized Buffer Tanks Reduce Water Hammer Damage for Pipe StationPressurized Buffer Tanks Reduce Water Hammer Damage for Pipe StationPressurized Buffer Tanks Reduce Water Hammer Damage for Pipe Station

FAQ

Q1:Are you trading company or manufacturer? 

A: We are manufacturer. Welcome to visit our factory and check our equipment.
 
Q2: What terms of payment do you accept? 
A: Payment method:T/T, Paypal, and Western Union.
 
Q3: What is your delivery time?
A: Usually 10-30 working days.
 
Q4: What's the minimum quantity of your order?
A: MOQ:1 Set.
 
Q5: How long is the warranty?
A: Quality guarantee period:1 year
 
Q6: How can you control the quality and delivery? 
A: All our machines will be tested before packaging. Wooden packing is strong and safety for long delivery. 
 
Q7: How can I install the equipment? 
A: Provide guide videos and online support to help test machines, and train buyer's staff for installing, operating and maintaining. When necessary, we can also send technician to your factory. 
 
Q8: Where is your factory? 
A: Nanjing city, Jiangsu Province, and Chahe city, Anhui Province, China

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
130
Year of Establishment
2009-06-19