Heat Recovery Steam Condensate Pump for Boiler System

Product Details
Customization: Available
After-sales Service: 1 Year
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
130
Year of Establishment
2009-06-19
  • Heat Recovery Steam Condensate Pump for Boiler System
  • Heat Recovery Steam Condensate Pump for Boiler System
  • Heat Recovery Steam Condensate Pump for Boiler System
  • Heat Recovery Steam Condensate Pump for Boiler System
  • Heat Recovery Steam Condensate Pump for Boiler System
  • Heat Recovery Steam Condensate Pump for Boiler System
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Features
  • Company Profile
  • Our Advantages
  • FAQ
Overview

Basic Info.

Model NO.
BTLBZ
Type
Condensate Recovery
Certification
CE, ISO, CCC
Brand
Beite
Maximum Air Source Working Pressure
1.0MPa
Maximum Design Pressure
1.6MPa
Single Pump Discharge Capacity
Max 5000 (Kg/H) - 0.8MPa - 12m
Maximum Operating Temperature
198°c
Maximum Lift
80m
Transport Package
Wooden Case
Specification
Customized
Trademark
Beite
Origin
Jiangsu, China
Production Capacity
2000pieces/Month

Product Description

Product Description

The pneumatic condensate recovery pump is designed to pump condensate, oil and other high-temperature liquids without using electricity, without maintenance, and can pump a large amount of condensate and other liquids from low-level, low-pressure or vacuum places to high places and high pressure area. Compared with traditional electric pumps, pneumatic condensate recovery pumps can pump high-temperature condensate water above 99°C. Since there is no high-speed rotating sealing structure, motor and pump impeller, there are no leakage and cavitation problems.

Heat Recovery Steam Condensate Pump for Boiler System

 

Product Parameters

Specifications

Maximum Air Source Working Pressure: 1.0Mpa
Maximum Design Pressure: 1.6Mpa
Single Pump Discharge Capacity: Max 5000 (kg/h) - 0.8Mpa - 12m
Maximum Operating Temperature: 198°C
Maximum Lift: 80m




Working Principle

The liquid enters the pump under the action of gravity through the inlet check valve, causing the float to rise. When the float goes up to its upper limit position, the air supply valve opens, steam or compressed air enters the pump body, and gradually builds up pressure in the pump until it reaches a state sufficient to overcome the back pressure, and the pressurized liquid opens the outlet check valve , start to discharge liquid. When the float goes down to its lower limit position, the air supply valve is closed, the steam or compressed air is cut off, and the exhaust valve is opened at the same time, the pressure in the pump decreases. The liquid now refills the pump chamber.



Structure

Condensate Recovery Pump + Water Tank + Valves + Electronic Detector + Metal Frame

 

Heat Recovery Steam Condensate Pump for Boiler System

 

Discharge Capacity

1. This diacharge diagram is drawn based on the height of the water inlet pressure head being 0.3m and the pipe diameter of the discharge port of the pump body being DN50.

2. Transverse Axis-Discharge Data, Longitudinal Axis-Dynamic Pressure Data, Red Curve-Total Effective Head.  

3.
 Dual pumps have twice the discharge capacity of single pumps, three pumps have three times discharge capacity of a single pump.

 
Heat Recovery Steam Condensate Pump for Boiler System


Selection


 

Model
 
Maximum Recovery
 
Condensate Inlet
 
Outlet
 
 Air Intake
 
Air Source Working Pressure
 
Dimensions
 
A B C

BTLBZ-5

6T/H

DN80/DN50 (Flange)

DN50 (Flange )

DN20

0.2-1.0MPa

1463

460

930

Heat Recovery Steam Condensate Pump for Boiler System


 

Model
 
Maximum Recovery
 
Condensate Inlet
 
Outlet
 
 Air Intake
 
Air Source Working Pressure
 
Dimensions
 
A B C

BTLBZ-5

6T/H

DN80/DN50 (Flange)

DN50 (Flange )

DN20

0.2-1.0MPa

1463

460

930
 
 
 

Heat Recovery Steam Condensate Pump for Boiler System


 

Model
 
Maximum Recovery
 
Condensate Inlet
 
Outlet
 
 Air Intake
 
Air Source Working Pressure
 
Dimensions
 
A B C

BTLBZ-15

15T/H

DN100 (Flange)

DN100 (Flange )

DN80

0.2-1.0MPa

1785

1500

1380


Heat Recovery Steam Condensate Pump for Boiler System
 
Features


1. Complete combined pump design - the overall design is excellent, ensuring working performance and convenient on-site installation.

2. Use steam or compressed gas as power - it is convenient to connect pipelines on site, without power supply, and is suitable for dangerous and dirty and humid environments.

3. Floating ball mechanism - no cavitation and mechanical seal problems inherent in electric pumps, reducing maintenance costs and downtime.

4. Open water tank design - no need for a water tank on site, reducing costs.

5. Metal frame structure - easy to carry.

6. Can recover and remove condensed water and concentrate sewage in any operating environment.

7. It can be used in operating areas with high requirements for hazardous and explosion-proof grades.

8. Capable of operating high temperature liquids without cavitation, reducing maintenance costs, also suitable for industrial liquids (oil, sewage and hydrocarbons).



Application

Applied to long-distance transportation, low pressure or vacuum system, high back pressure condensate system, occasions with large pump liquid volume, occasions that do not require electricity, occasions with flammable, explosive and harmful media, humid and dirty environments, and open discharge Water storage tank, the best choice for condensed water in the sump.


Maintenance

 
1. The drainage (sewage) ports of the pump and column must be opened regularly for drainage (sewage).

2. If the pump is out of service for a long time, it is necessary to open the pump cover and apply butter to the rotating parts of the pump core for maintenance.
 
Company Profile

Nanjing Beite Air Conditioning Equipment Co., Ltd. is a high-tech comprehensive enterprise specializing in the research and development, production, sales and after-sales service of HVAC water treatment equipment. Our company has two production plants, four standardized workshops and two office buildings, with a total area of 48,000 square meters. We mainly provide corresponding water treatment equipment for HVAC circulating water system with one-stop supply and service.


Heat Recovery Steam Condensate Pump for Boiler System
 

Professional Production Line

 
Heat Recovery Steam Condensate Pump for Boiler System
 

Our Team

 
Heat Recovery Steam Condensate Pump for Boiler System
 

Exihibtion

 
Heat Recovery Steam Condensate Pump for Boiler System
 
 
Our Advantages


17 years of R & D and production experience in HVAC industry

Fast delivery, smart factory standardized production
 
24 hours on-line service, prompt and professional answering
 
Installation and comission support and professional after-sales service
 
Cost-effective Beite focus on high quality and inexpensive


 
FAQ

Q1: Can I have a sample ?
A : Yes, welcome to place sample order to test and check quality. Mixed samples are also OK.

Q2: What is your lead time for production?
A : Generally Sample needs 1-3 days,mass production needs 15-30 days,also depands on your request.

Q3 : Can you accept mixed batch of different products?
A : Yes,we can provide different product mix wholesale.

Q4: What payment terms do you accept?
A :Trade assurance,TT,Western Union.

Q5 : What is the warranty for your products?
A :We provide one year warranty for the products..

Q6 : Are you trading company or manufacturer?
A :Yes,We are manufacturer.Welcome to visit our factory and check our pruducts.

Q7: What terms of payment do you accept?
A: Payment method:T/T,Paypal,western union.

Q8: What is your delivery time?
A: Delivery term:15-30 working days.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier